Project management is the discipline of planning, organizing, securing, managing, leading, and controlling resources to achieve specific goals. A project is a temporary endeavor with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables),[undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value. The temporary nature of projects stands in contrast with business as usual (or operations), which are repetitive, permanent, or semi-permanent functional activities to produce products or services. In practice, the management of these two systems is often quite different, and as such requires the development of distinct technical skills and management strategies.
The primary challenge of project management is to achieve all of the project goals and objectives while honoring the preconceived constraints. Typical constraints are scope, time, andbudget. The secondary—and more ambitious—challenge is to optimize the allocation of necessary inputs and integrate them to meet pre-defined objectives.
 
  • Like
Reactions: eXcalibuR

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
The traditional approach

A traditional phased approach identifies a sequence of steps to be completed. In the "traditional approach", five developmental components of a project can be distinguished (four stages plus control):


Typical development phases of an engineering project
initiation
planning and design
execution and construction
monitoring and controlling systems
completion
Not all projects will have every stage, as projects can be terminated before they reach completion. Some projects do not follow a structured planning and/or monitoring process. And some projects will go through steps 2, 3 and 4 multiple times.
Many industries use variations of these project stages. For example, when working on a brick-and-mortar design and construction, projects will typically progress through stages like pre-planning, conceptual design, schematic design, design development, construction drawings (or contract documents), and construction administration. In software development, this approach is often known as the waterfall model,i.e., one series of tasks after another in linear sequence. In software development many organizations have adapted the Rational Unified Process (RUP) to fit this methodology, although RUP does not require or explicitly recommend this practice. Waterfall development works well for small, well defined projects, but often fails in larger projects of undefined and ambiguous nature. The Cone of Uncertainty explains some of this as the planning made on the initial phase of the project suffers from a high degree of uncertainty. This becomes especially true as software development is often the realization of a new or novel product. In projects where requirements have not been finalized and can change, requirements management is used to develop an accurate and complete definition of the behavior of software that can serve as the basis for software development. While the terms may differ from industry to industry, the actual stages typically follow common steps to problem solving—"defining the problem, weighing options, choosing a path, implementation and evaluation."
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
PRINCE2


PRINCE2 is a structured approach to project management, released in 1996 as a generic project management method. It combined the original PROMPT methodology (which evolved into the PRINCE methodology) with IBM's MITP (managing the implementation of the total project) methodology. PRINCE2 provides a method for managing projects within a clearly defined framework. PRINCE2 describes procedures to coordinate people and activities in a project, how to design and supervise the project, and what to do if the project has to be adjusted if it does not develop as planned.

In the method, each process is specified with its key inputs and outputs and with specific goals and activities to be carried out. This allows for automatic control of any deviations from the plan. Divided into manageable stages, the method enables an efficient control of resources. On the basis of close monitoring, the project can be carried out in a controlled and organized way.

PRINCE2 provides a common language for all participants in the project. The various management roles and responsibilities involved in a project are fully described and are adaptable to suit the complexity of the project and skills of the organization.

 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
PRiSM
PRiSM is a structured project management method developed to align organizational sustainability initiatives with project delivery. By Design, PRiSM is a repeatable, practical and proactive methodology that ensures project success while decreasing an organization's negative environmental impact.
The methodology encompasses the management, control and organization of a project with consideration and emphasis beyond the project life-cycle and on the five aspects of sustainability. PRiSM is also used to refer to the training and accreditation of authorized practitioners of the methodology who must undertake accredited qualifications based on competency to obtain the GPM certification.
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Critical chain project management
Critical chain project management (CCPM) is a method of planning and managing project execution designed to deal with uncertainties inherent in managing projects, while taking into consideration limited availability of resources (physical, human skills, as well as management & support capacity) needed to execute projects.
CCPM is an application of the Theory of Constraints (TOC) to projects. The goal is to increase the flow of projects in an organization (throughput). Applying the first three of the five focusing steps of TOC, the system constraint for all projects is identified as are the resources. To exploit the constraint, tasks on the critical chain are given priority over all other activities. Finally, projects are planned and managed to ensure that the resources are ready when the critical chain tasks must start, subordinating all other resources to the critical chain.
The project plan should typically undergo resource leveling, and the longest sequence of resource-constrained tasks should be identified as the critical chain. In some cases, such as managing contracted sub-projects, it is advisable to use a simplified approach without resource leveling.
In multi-project environments, resource leveling should be performed across projects. However, it is often enough to identify (or simply select) a single "drum". The drum can be a resource that acts as a constraint across projects, which are staggered based on the availability of that single resource.
One can also use a "virtual drum" by selecting a task or group of tasks (typically integration points) and limiting the number of projects in execution at that stage.
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Event chain methodology
Event chain methodology is another method that complements critical path method and critical chain project management methodologies.
Event chain methodology is an uncertainty modeling and schedule network analysis technique that is focused on identifying and managing events and event chains that affect project schedules. Event chain methodology helps to mitigate the negative impact of psychological heuristics and biases, as well as to allow for easy modeling of uncertainties in the project schedules. Event chain methodology is based on the following principles.
Probabilistic moment of risk: An activity (task) in most real-life processes is not a continuous uniform process. Tasks are affected by external events, which can occur at some point in the middle of the task.
Event chains: Events can cause other events, which will create event chains. These event chains can significantly affect the course of the project. Quantitative analysis is used to determine a cumulative effect of these event chains on the project schedule.
Critical events or event chains: The single events or the event chains that have the most potential to affect the projects are the “critical events” or “critical chains of events.” They can be determined by the analysis.
Project tracking with events: Even if a project is partially completed and data about the project duration, cost, and events occurred is available, it is still possible to refine information about future potential events and helps to forecast future project performance.
Event chain visualization: Events and event chains can be visualized using event chain diagrams on a Gantt chart.
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Process-based management

Also furthering the concept of project control is the incorporation of process-based management. This area has been driven by the use of Maturity models such as the CMMI (capability maturity model integration; see this example of a predecessor) and ISO/IEC15504 (SPICE – software process improvement and capability estimation).
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Agile project management



The iteration cycle in agile project management
Agile project management approaches based on the principles of human interaction management are founded on a process view of human collaboration. It is "most typically used in software, website, technology, creative and marketing industries." This contrasts sharply with the traditional approach. In the agile software development or flexible product development approach, the project is seen as a series of relatively small tasks conceived and executed as the situation demands in an adaptive manner, rather than as a completely pre-planned process.
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Lean project management

Lean project management combines principles from lean manufacturing with agile project management, to focus on delivering more value with less waste.
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Extreme project management







Planning and feedback loops inExtreme programming (XP) with the time frames of the multiple loops.

In critical studies of project management it has been noted that several PERT based models are not well suited for the multi-project company environment of today. Most of them are aimed at very large-scale, one-time, non-routine projects, and currently all kinds of management are expressed in terms of projects.

Using complex models for "projects" (or rather "tasks") spanning a few weeks has been proven to cause unnecessary costs and low maneuverability in several cases. Instead, project management experts try to identify different "lightweight" models, such as Extreme Programming and Scrum.

The generalization of Extreme Programming to other kinds of projects is extreme project management, which may be used in combination with the process modeling and management principles of human interaction management.

 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Processes
The project development stages
Traditionally, project management includes a number of elements: four to five process groups, and a control system. Regardless of the methodology or terminology used, the same basic project management processes will be used. Major process groups generally include:
initiation
planning or development
production or execution
monitoring and controlling
closing
In project environments with a significant exploratory element (e.g., research and development), these stages may be supplemented with decision points (go/no go decisions) at which the project's continuation is debated and decided. An example is the stage-gate model.
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Initiating





The initiating processes determine the nature and scope of the project. If this stage is not performed well, it is unlikely that the project will be successful in meeting the business’ needs. The key project controls needed here are an understanding of the business environment and making sure that all necessary controls are incorporated into the project. Any deficiencies should be reported and a recommendation should be made to fix them.
The initiating stage should include a plan that encompasses the following areas:
analyzing the business needs/requirements in measurable goals
reviewing of the current operations
financial analysis of the costs and benefits including a budget
stakeholder analysis, including users, and support personnel for the project
project charter including costs, tasks, deliverables, and schedule
 

Wasif Safi

!!pRaISe D CReAtOr!!
Banned
Oct 1, 2009
14,987
4,810
513
Hyderabad, India
Planning and design

After the initiation stage, the project is planned to an appropriate level of detail (see example of a flow-chart). The main purpose is to plan time, cost and resources adequately to estimate the work needed and to effectively manage risk during project execution. As with the Initiation process group, a failure to adequately plan greatly reduces the project's chances of successfully accomplishing its goals.

Project planning generally consists of

determining how to plan (e.g. by level of detail or rolling wave);

developing the scope statement;

selecting the planning team;

identifying deliverables and creating the work breakdown structure;

identifying the activities needed to complete those deliverables and networking the activities in their logical sequence;

estimating the resource requirements for the activities;

estimating time and cost for activities;

developing the schedule;

developing the budget;

risk planning;

gaining formal approval to begin work.

Additional processes, such as planning for communications and for scope management, identifying roles and responsibilities, determining what to purchase for the project and holding a kick-off meeting are also generally advisable.

For new product development projects, conceptual design of the operation of the final product may be performed concurrent with the project planning activities, and may help to inform the planning team when identifying deliverables and planning activities.
 